Live

London

Stormwater-credit opportunity universe — the lead pool, the bylaw, what's defensible, and the sales talking points.

2,190
Credit-eligible parcels
$14.2M
Annual stormwater billing
$7.1M
Potential annual savings at 50%
270
Parcels billing over $10K
Bylaw at a glance
BylawWM-28 — Wastewater & Stormwater Bylaw, effective Jan 1 2026
Rate$172.62 per hectare per month ($2,071.44 / ha / yr)
Billing basisTotal parcel area — not impervious surface (this is structurally different from Mississauga and Hamilton)
Size thresholdLands over 0.4 hectares qualify for area-based charging and credit eligibility
Credit cap50% maximum reduction for ICI properties
Credit requirementProfessional Engineer storm drainage report demonstrating reduced runoff volume
Credit durationValid up to 5 years or until site conditions change
Residential≤0.4 ha flat fee $20.74/mo — not credit-eligible
Top lead categories
Category
Leads
Total $/yr
Industrial
1,095
$8.9M
Institutional
395
$2.8M
Commercial
700
$2.5M
Industrial alone is 63% of billing — and London is heavily industrial west of the GTA. 270 parcels bill over $10K each.
What makes London different

Billing is by total hectares, not impervious surface unique

Where Mississauga charges per m² of impervious area and Hamilton charges per billing unit of impervious area, London charges per hectare of total parcel area. A 10-hectare warehouse with 80% blacktop and a 10-hectare campus with 30% blacktop pay the same base bill — until the campus runs the engineer's report and earns up to 50% off. That makes the credit case dramatically stronger for low-impervious sites in London: lots of headroom between "what you're paying" and "what your runoff actually warrants."

Data provenance & defensibility
Source layerCity of London's self-hosted ArcGIS at maps.london.ca — Parcels (BaseMaps/53), Addresses (Community/0), Zoning (Community/16)
Parcels ingested112,351 polygons across the city
Land-use assignmentEach parcel centroid spatially joined to the city's Generalized Land Use zoning to classify ICI vs residential
Charge calculationParcel area (ha) × $172.62 × 12 — exactly the bylaw formula. No imagery estimation involved.
Eligibility filterICI (Commercial / Industrial / Institutional) + parcel area > 0.4 ha
v2 — imagerySCOOP imagery overlay still useful for scoring credit-likelihood (lower impervious % = stronger PE-report case) — not required for v1 billing accuracy
Charge distribution
Median charge$2,308 / yr per eligible parcel
90th percentile$12,513 / yr
Largest single charge$961,359 / yr (1950 Avro Rd — London International Airport)
$10K+ priority list270 parcels billing over $10K each — the focused outbound shortlist
Notable contested leads
1950 Avro Rd$961,359 / yr · 464 ha · Industrial — London International Airport (CYXU). Flag for manual review; airport stormwater billing is often contested between municipality and airport authority.
1400 Western Rd$160,728 / yr · 77.6 ha · Institutional — Western University main campus. Large institutions are excellent credit candidates due to extensive green space.
For the sales call
"Wait — you charge by parcel size, not impervious?"
Correct — London's bylaw WM-28 charges per hectare of total parcel area, not impervious surface. That's actually good news for credit cases. A property with significant pervious area is paying the same rate as a fully-paved neighbor of the same size, but has a much stronger engineering case for the 50% reduction.
"How do you know the charges are right?"
It's the bylaw formula directly: parcel area (in hectares, from the city's published parcel layer) × $172.62/mo. No estimation, no imagery dependency — the numbers are deterministic from city data.
"How recent is the data?"
Bylaw rate effective Jan 1 2026, pulled directly from WM-28. Parcels + zoning re-synced any time the city updates them.
"Why aren't residential properties on the list?"
Residential properties ≤ 0.4 ha pay a flat $20.74/month with no credit available. Above 0.4 ha they pay area-based but the city's Stormwater Rate Reduction Program is explicitly ICI-only. Including residential would dilute the prospect list.

Open the live map

Filter by charge range, search any address, click any parcel for charge + savings + eligibility — and pull the ranked CSV.

/london.html →