Upper West Side Secondary Plan - Subwatershed Study and Stormwater Master Plan Overview Report · Subdivision · 2023-11-01
Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.
| Storm event | Pre-dev (m3/s) | Post-dev (m3/s) | Δ |
|---|---|---|---|
| Multiple (2-yr To 100-yr) | 1.88 | 14.12 | +651% |
Total tributary area 81.7 ha, 55% impervious, composite runoff coefficient 0.55, pre-development peak flow 1.88 m3/s, post-development peak flow 14.12 m3/s. Dry pond, no permanent pool. Extended detention required/provided 9,214 m3; attenuation required/provided 44,106 m3. Total provided (excl. freeboard) 53,320 m3.
Flood control target for AEGD = 303-438 m3/ha. Fifteen SWM facilities (6 SWM ponds and 8 storage tanks) proposed. No permanent pool required. Erosion control: 15mm runoff volume released over 24hr detention time.
LID capture targets range from 60-130 m3/imp ha depending on land use and soil type. 29mm infiltration/retention target referenced for ponds. 10mm minimum water quality infiltration target.
LID conveyance controls including bioswales referenced as part of treatment train approach (Alternative 6).
Referenced in QualHymo model as Special Bioretention and Bioretention facilities as LID source controls.
Main building roof drained to cistern for rainwater harvesting; contents used for outdoor irrigation. Modelled in QualHymo for 20 ha Prestige Business Park site plan example.
How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.