Upper Wellington Street (Limeridge Road East to Stone Church Road East) Schedule C (Phases 1–4) Municipal Class Environmental Assessment · Retrofit · 2025-06-27
Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.
| Storm event | Pre-dev (m3/s) | Post-dev (m3/s) | Δ |
|---|---|---|---|
| 5-yr 24-hr | 2.7 | — | — |
| 100-yr 24-hr | 4.89 | — | — |
Conceptual superpipe storage system proposed for quantity control at Sirente Drive; sized to control post-development peak flows to existing conditions for 2- through 100-year storms
Conceptual superpipe storage system proposed for quantity control at Desoto Drive; sized to control post-development peak flows to existing conditions for 2- through 100-year storms
Infiltration trenches proposed under pedestrian/bike lanes and sidewalks for erosion/volume control (25 mm event) and water quality; 50 mm clear stone with 0.4 void ratio; minimum 1 m above groundwater/bedrock; subject to geotechnical confirmation
Silva Cells or equivalent modular cellular soil storage systems carried forward for consideration; provide infiltration and evapotranspiration; require pre-treatment (CB Shields or OGS)
Two OGS units proposed downstream of superpipe systems for quality control; City accepts 50% TSS removal credit for OGS; Stormceptor EF or equivalent; secondary controls (CB Shields) also anticipated south of Desoto Drive
CB Shield catch basin inserts proposed as secondary water quality measure particularly south of Desoto Drive to Stone Church Road East; up to 50% TSS removal per ETV testing
How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.