Parsed SWM report

Ponderosa Nature Resort - Water and Wastewater Systems Impro

Ponderosa Nature Resort - Water and Wastewater Systems Improvements · Redevelopment · —

Consultant: R.J. Burnside & Associates Limited Model: UNKNOWN Revision: Draft
Credit scorecard — Hamilton bylaw

Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.

On-site controls
documented source control on the site
50%
Lake Ontario green-space bonus
direct discharge + green-space parcel flag (90% tier) — not documented
0%
Net credit
50% baseline; up to 90% with Lake Ontario direct-discharge + green-space flag
50%
Pre vs post peak discharge

No quantified pre-vs-post hydraulic events extracted.

Stormwater controls (2)
OtherCentralized Wastewater Treatment Plant (MBR) with surface discharge to on-site pond
Storage volume36.0 m³
Outletother

Equalization tank 36 m3; rated capacity 121 m3/d; peak hourly flow 13.5 m3/hr (324 m3/d); design avg flow 60 m3/d; max day 180 m3/d; membrane bioreactor with UV disinfection; surface discharge to on-site pond draining to Bronte Creek

OtherExisting/Proposed Leaching Beds (subsurface discharge alternative)
Outletother

Alternative 3 - subsurface discharge via leaching bed system

Best management practices (6)
Lot-level stormwater quantity controlsMembrane Bioreactor (MBR) wastewater treatmentUV disinfectionEqualization tankLow-pressure sewer with individual grinder pumpsDecommissioning of existing septic systems
Site characteristics & report metadata
ProjectPonderosa Nature Resort - Water and Wastewater Systems Improvements
Project typeRedevelopment
DeveloperPonderosa Nature Resort
Permit300050185.0000
Existing land usemobile home/trailer park (nature resort)
Proposed land usemobile home/trailer park with expanded units
Quality control methodMembrane bioreactor (MBR) tertiary treatment with UV disinfection prior to surface discharge
Extraction audit
Confidence: low Completeness: 29% Source: 361-page PDF Extractor: PARCELFLOW v1 Validation: review recommended

How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.