Parsed SWM report

Neyagawa

Draft Plan of Subdivision - ARGO Neyagawa · Subdivision · 2023-12-01

Consultant: Trafalgar Engineering Model: HYDROCAD Revision: 1
Credit scorecard — Oakville 2026 bylaw

Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.

Enhanced SWM (≥80% TSS)
Provincial Enhanced — exceeds Oakville minimums
50%
Normal SWM (≥70% TSS)
Provincial Normal — meets baseline — not documented
0%
Basic SWM (≥60% TSS)
Provincial Basic — meets minimum — not documented
0%
Net credit
Up to 50% for non-residential with SWM exceeding minimum design standards
50%
Pre vs post peak discharge
Storm eventPre-dev (m3/s)Post-dev (m3/s)Δ
2-yr 24-hr0.021
5-yr 24-hr0.053
10-yr 24-hr0.08
25-yr 24-hr0.116
50-yr 24-hr0.139
100-yr 24-hr0.163
Custom 2-yr 25Mm0.011
Stormwater controls (2)
Wet detention pondSWM Pond (Pond 3P)
Storage volume11,653.0 m³
Outletcompound weir
Outlet invert177.25 m
100-yr HGL178.50 m

Primary outlet: 115mm vertical orifice/grate at invert 177.250m, C=0.600. Secondary outlet (weir): invert 177.850m, user-defined rating curve. Pond located in southwest corner of development. Discharges to future extension of Fourth Line storm sewer. Retaining walls along north and east sides. Available storage = 11,653.0 m3.

Infiltration

Infiltration referenced in Section 5.5 of report as a stormwater management measure.

Best management practices (6)
wet urban pondinfiltrationcut-off swalestemporary sediment pondsilt fencingerosion and sediment control
Site characteristics & report metadata
ProjectDraft Plan of Subdivision - ARGO Neyagawa
Project typeSubdivision
DeveloperARGO Development Corporation
Proposed land useresidential subdivision
Site area10.23 ha
Impervious0% (pre) → 85% (post)
TSS removal target80%
Quality control methodwet pond
Extraction audit
Confidence: high Completeness: 88% Source: 93-page PDF Extractor: PARCELFLOW v1 Validation: passed

How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.