Parsed SWM report

Conservation Meadows Subdivision – Phase 2

Conservation Meadows Subdivision – Phase 2 · Subdivision · 2024-08-01

Consultant: Stantec Consulting Ltd. Engineer: Hitesh Lad, M.Eng., P.Eng. P.Eng sealed Model: OTHER Revision: Revised August 2024
Credit scorecard — city bylaw

Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.

Peak Flow
discharge reduction — not documented
0%
Water Quality
TSS removal — not documented
0%
Runoff Volume
water-balance capture (2%/mm) — not documented
0%
Operations
combinable O&A sub-credits — not documented
0%
Net credit
27%
Pre vs post peak discharge
Storm eventPre-dev (m3/s)Post-dev (m3/s)Δ
1.25-yr0.12
2-yr0.18
5-yr0.29
10-yr0.37
25-yr0.48
100-yr0.66
Stormwater controls (4)
InfiltrationRock Trench – Single Multi Block Roof
Storage volume2.0 m³

Trench surface area 9.5 sq.m, depth 0.6 m, porosity 0.35, subsoil exfil rate 4 mm/hr, 70 sq.m roof area directly to trench, SF 15%, actual footprint 10.925 sq.m

InfiltrationRock Trench – Single Street Fronting Town
Storage volume2.5 m³

Trench surface area 12 sq.m, depth 0.6 m, porosity 0.35, subsoil exfil rate 4 mm/hr, 90 sq.m roof area directly to trench, SF 15%, actual required footprint 13.8 sq.m

InfiltrationRock Trench – Single House
Storage volume4.2 m³

Trench surface area 20 sq.m, depth 0.6 m, porosity 0.35, subsoil exfil rate 4 mm/hr, 150 sq.m roof area directly to trench, SF 15%, actual footprint 23 sq.m

SwaleSwale (referenced in water balance model)

Swale referenced as a routing element in the volumetric water balance model (column header 'into Swale')

Best management practices (2)
Rock Trench / Infiltration TrenchSwale
Site characteristics & report metadata
ProjectConservation Meadows Subdivision – Phase 2
Project typeSubdivision
DeveloperActiva Holdings Inc.
Proposed land useresidential subdivision
Extraction audit
Confidence: medium Completeness: 54% Source: 89-page PDF Extractor: PARCELFLOW v1 Validation: review recommended

How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.