Prologis Meadowvale Distribution Centre · New · 2026-03-04
Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.
| Storm event | Pre-dev (m3/s) | Post-dev (m3/s) | Δ |
|---|---|---|---|
| 2-yr 24-hr | 0.099 | 0.053 | −46% |
| 5-yr 24-hr | 0.184 | 0.157 | −15% |
| 10-yr 24-hr | 0.274 | 0.259 | −5% |
| 25-yr 24-hr | 0.354 | 0.351 | −1% |
| 50-yr 24-hr | 0.431 | 0.43 | −0% |
| 100-yr 24-hr | 0.516 | 0.494 | −4% |
400mm orifice; overflow point at 210.95m to Lisgar Channel; wrapped in impermeable liner; orifice invert 207.70m, tank outlet invert 207.72m
Open-bottom Brentwood ST-18 system; footprint 951.60m2; retention volume provided 239.70m3; excess flow discharges to SWM facility bypass storm network
Open-bottom Brentwood ST-18 system; footprint 1306.81m2; retention volume provided 336.00m3; excess flow discharges to SWM facility bypass storm network
Two orifice outlets: Orifice 1 = 150mm diameter (invert 208.40m), Orifice 2 = 450mm diameter (invert 208.95m); discharges to Tenth Line swale; temporary solution until future municipal storm sewer available
Treats runoff from area surrounding distribution centres; catchment area 5.10 ha, 75% impervious; 61% TSS removal; captures >90% annual runoff volume
Treats runoff from northwest Data Centre driveway; catchment area 2.30 ha, 48% impervious; 62% TSS removal; captures >90% annual runoff volume
Treats runoff from southeast Data Centre driveway; catchment area 0.40 ha, 56% impervious; 61% TSS removal; captures >90% annual runoff volume
Existing drainage swale parallel to Tenth Line ROW; receives controlled discharge from dry pond and uncontrolled perimeter areas
How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.