Credit scorecard — Mississauga bylaw
Each category awards a maximum percentage of the annual stormwater charge as credit.
Evidence is extracted directly from the source PDF — no manual review.
—Peak Flow
discharge reduction — not documented
0%
✓Water Quality
TSS removal 81% (enhanced)
30%
✓Runoff Volume
water balance retains 5 mm on site (2% per mm, max 30% at 15 mm)
30%
✓Operations
BMPs + P.Eng present; sub-credit detection pending — full 20% requires explicit O&A items
20%
Net credit
Capped at 50% of annual stormwater charge
50%
Pre vs post peak discharge
| Storm event | Pre-dev (L/s) | Post-dev (L/s) | Δ |
| 2-yr | — | 35.18 | — |
| 5-yr | — | 41.89 | — |
| 10-yr | — | 48.6 | — |
| 25-yr | — | 54.49 | — |
| 50-yr | — | 57.23 | — |
| 100-yr | — | 62.32 | — |
Stormwater controls (2)
Underground storageCupolex Underground Concrete Stormwater Tank
Storage volume355.3 m³
Treatment volume314.1 m³
Outletorifice
Outlet invert195.74 m
100-yr HGL196.95 m
140 mm orifice tube; dead storage sump of 56.01 m3 for water balance/irrigation reuse; active storage 314.15 m3; groundwater discharge of 0.56 L/s included in analysis
Oil-grit separatorHydro International Up-Flo Filter (CPZ Media)
Provides 81% TSS removal on annual loading basis; located downstream of stormwater management tank; treats controlled drainage from Catchment 201
Best management practices (3)
Cupolex Underground Concrete Stormwater TankHydro International Up-Flo Filter with CPZ Media140 mm orifice flow control
Site characteristics & report metadata
Project6333 Hurontario Street Multi-Storey Commercial Self-Storage Development
Project typeRedevelopment
DeveloperDymon Group of Companies
PermitRegion File 0Z-21-001M
Existing land useresidential/commercial with unpaved parking
Proposed land usecommercial self-storage
Site area0.80 ha
Water balance capture5.0 mm
TSS removal target81%
Allowable release rate80.8 L/s
Quality control methodHydro International Up-Flo Filter with CPZ Media providing 81% TSS removal on annual loading basis
Extraction audit
Confidence: high
Completeness: 83%
Source: 85-page PDF
Extractor: PARCELFLOW v1
Validation: passed
Source PDF: OZ-21-001-W5_Functional-Servicing-Stormwater-Management-Report-May2023.pdf (85 pages)
Open source PDF →
Starter package
Download credit application package »
10-page PDF: pre-filled Form 2703, starter P.Eng report skeleton, submission checklist. Engineer reviews, adds site inspection + O&M plan, certifies + submits.
Download PDF »
How to read this page. Every value above was extracted from the source PDF by the
PARCELFLOW report parser, which combines a layout-robust template detector with a
validated extraction stage tuned to Ontario Functional Servicing and Stormwater
Management reports. The four-category scorecard maps the parsed evidence onto
Mississauga's credit bylaw. Numbers are estimates — engineering review still required
before submitting a formal credit application to the City.