Credit scorecard — Mississauga bylaw
Each category awards a maximum percentage of the annual stormwater charge as credit.
Evidence is extracted directly from the source PDF — no manual review.
—Peak Flow
discharge reduction — not documented
0%
✓Water Quality
TSS removal 80% (enhanced)
30%
✓Runoff Volume
water balance retains 5 mm on site (2% per mm, max 30% at 15 mm)
30%
✓Operations
BMPs + P.Eng present; sub-credit detection pending — full 20% requires explicit O&A items
20%
Net credit
Capped at 50% of annual stormwater charge
50%
Pre vs post peak discharge
| Storm event | Pre-dev (L/s) | Post-dev (L/s) | Δ |
| 2-yr Pre (Cooksville Creek Target) | 203.45 | 203.45 | +0% |
| 100-yr Post Uncontrolled (Cooksville Creek) | 203.45 | 896.04 | +340% |
| 100-yr Post Controlled (Cooksville Creek) | 203.45 | 203.45 | +0% |
| 10-yr Pre (Cawt-hra Creek Target) | 8.26 | — | — |
| 2-yr Post Uncontrolled (Cawt-hra Creek) | 8.26 | 1.81 | −78% |
Stormwater controls (2)
Underground storageUnderground Stormwater Tank
Storage volume702.0 m³
Treatment volume95.0 m³
Outletorifice
Located within the underground parking structure at the southwest corner. Controlled release rate of 155.4 L/s. Dead storage of 95 m3 for water balance. Storage to be reused as grey water or for irrigation.
Oil-grit separatorStormceptor EF10
Installed downstream of the underground stormwater tank. Sized for 60% TSS removal using CA ETV particle size distribution, equivalent to 80% removal using Stormceptor Fine PSD. Water quality flow rate: 55.60 L/s. Drainage area: 2.31 ha.
Best management practices (5)
Underground Stormwater TankStormceptor EF10 Oil/Grit SeparatorRainwater Harvesting (grey water reuse/irrigation)Green RoofsEnhanced Topsoil
Site characteristics & report metadata
Project579, 619 Lakeshore Road East and 1022, 1028 Caven Street Redevelopment
Project typeRedevelopment
DeveloperStar Seeker Inc.
PermitDARC 20-200 W1
Existing land usemixed commercial and residential
Proposed land usemixed-use residential with at-grade non-residential
Site area2.42 ha
Water balance capture5.0 mm
TSS removal target80%
Allowable release rate155.4 L/s
Quality control methodoil-grit separator (Stormceptor EF10) downstream of underground stormwater tank
Extraction audit
Confidence: high
Completeness: 92%
Source: 68-page PDF
Extractor: PARCELFLOW v1
Validation: passed
Source PDF: Functional-Servicing-and-Stormwater-Management-Report-December-2022.pdf (68 pages)
Open source PDF →
Starter package
Download credit application package »
10-page PDF: pre-filled Form 2703, starter P.Eng report skeleton, submission checklist. Engineer reviews, adds site inspection + O&M plan, certifies + submits.
Download PDF »
How to read this page. Every value above was extracted from the source PDF by the
PARCELFLOW report parser, which combines a layout-robust template detector with a
validated extraction stage tuned to Ontario Functional Servicing and Stormwater
Management reports. The four-category scorecard maps the parsed evidence onto
Mississauga's credit bylaw. Numbers are estimates — engineering review still required
before submitting a formal credit application to the City.