Parsed SWM report

560 Winston Churchill Boulevard

560 Winston Churchill Boulevard - Stormwater Management and Functional Servicing Report · Redevelopment · 2023-08-17

Consultant: a.m. candaras associates inc. Model: VisualOTTHYMO Revision: Rev. August 17, 2023
Credit scorecard — Oakville 2026 bylaw

Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.

Enhanced SWM (≥80% TSS)
Provincial Enhanced — exceeds Oakville minimums
50%
Normal SWM (≥70% TSS)
Provincial Normal — meets baseline — not documented
0%
Basic SWM (≥60% TSS)
Provincial Basic — meets minimum — not documented
0%
Net credit
Up to 50% for non-residential with SWM exceeding minimum design standards
50%
Pre vs post peak discharge
Storm eventPre-dev (m3/s)Post-dev (m3/s)Δ
2-yr0.0570.037−35%
5-yr0.1110.074−33%
10-yr0.1520.106−30%
25-yr0.1990.144−28%
100-yr0.3210.233−27%
100-yr 24-hr Scs0.3210.272−15%
Regional1.832
Stormwater controls (1)
Wet detention pondSWM Wet Pond
Storage volume15,197.0 m³
Treatment volume3,045.1 m³
Surface area0.870 ha
Outletcompound weir
Outlet invert91.10 m

Permanent pool volume 3,045.1 m3 between elevations 90.00m and 91.10m. Erosion control volume 3,146.2 m3 between 91.10m and 91.90m. 125mm orifice at invert 91.10m; 175mm weir at elevation 91.90m; emergency overflow weir at 93.00m (12.00m wide). Drawdown time for erosion control volume is 61.1 hours. Enhanced Protection Level (80% TSS removal) per MOE SWMP 2003.

Best management practices (10)
wet ponderosion control volumepermanent poolsilt fencesdiversion swalesinlet protection devicessediment trapstemporary sediment ponderosion control blanketsrock protection
Site characteristics & report metadata
Project560 Winston Churchill Boulevard - Stormwater Management and Functional Servicing Report
Project typeRedevelopment
DeveloperBlackwood Partners
Proposed land usemixed residential / commercial
Site area12.93 ha
TSS removal target80%
Quality control methodwet pond providing Enhanced Protection Level (80% TSS removal) per MOE Stormwater Management Planning and Design Manual 2003
Extraction audit
Confidence: high Completeness: 88% Source: 128-page PDF Extractor: PARCELFLOW v1 Validation: passed

How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.