Parsed SWM report

50 Speers Road

Proposed 27-Storey Purpose-Built Rental Apartment Building at 50 Speers Rd · Redevelopment · 2024-02-26

Consultant: The Odan/Detech Group Inc. Model: VisualOTTHYMO Revision: Version 2
Credit scorecard — Oakville 2026 bylaw

Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.

Enhanced SWM (≥80% TSS)
Provincial Enhanced — exceeds Oakville minimums — not documented
0%
Normal SWM (≥70% TSS)
Provincial Normal — meets baseline — not documented
0%
Basic SWM (≥60% TSS)
Provincial Basic — meets minimum — not documented
0%
Net credit
Up to 50% for non-residential with SWM exceeding minimum design standards
15%
Pre vs post peak discharge
Storm eventPre-dev (L/s)Post-dev (L/s)Δ
5-yr80
100-yr80
Stormwater controls (2)
Underground storage100-Year Storm Detention Tank (P1 Level)
Storage volume114.0 m³
Outletorifice

Stormwater pump and orifice device to control discharge; gravity-driven orifice not feasible due to shallow existing storm sewer. Tank designed at SPA stage. Required storage 98 m3 for 100-yr storm; provided volume 114 m3.

Oil-grit separatorOGS Unit

Report states OGS unit is not required since majority of site area consists of roof and landscape area.

Best management practices (5)
Underground storm detention tankPump and orifice control deviceSilt fenceSediment socksEntrance mud mat
Site characteristics & report metadata
ProjectProposed 27-Storey Purpose-Built Rental Apartment Building at 50 Speers Rd
Project typeRedevelopment
DeveloperHelberg Properties Limited
Existing land use7-storey apartment building with surface parking
Proposed land use27-storey residential apartment building with underground parking
Site area0.42 ha
Impervious65% (pre) → 95% (post)
Allowable release rate80.0 L/s
Quality control methodRoof and landscape area drainage; OGS not required per report; TSS removal via surface type classification
Extraction audit
Confidence: high Completeness: 83% Source: 59-page PDF Extractor: PARCELFLOW v1 Validation: passed

How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.