Parsed SWM report

50 Sherwood Heights Drive

50 Sherwood Heights Drive – Functional Stormwater Management Report · New · 2022-03-03

Consultant: WalterFedy Model: VisualOTTHYMO
Credit scorecard — Oakville 2026 bylaw

Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.

Enhanced SWM (≥80% TSS)
Provincial Enhanced — exceeds Oakville minimums
50%
Normal SWM (≥70% TSS)
Provincial Normal — meets baseline — not documented
0%
Basic SWM (≥60% TSS)
Provincial Basic — meets minimum — not documented
0%
Net credit
Up to 50% for non-residential with SWM exceeding minimum design standards
50%
Pre vs post peak discharge
Storm eventPre-dev (m3/s)Post-dev (m3/s)Δ
2-yr0.1770.081−54%
5-yr0.3680.118−68%
10-yr0.4820.134−72%
25-yr0.6840.156−77%
50-yr0.8350.172−79%
100-yr0.9890.186−81%
Stormwater controls (4)
Dry detentionPond 1 (Pond 1100 / SWM Pond #1)
Storage volume3,393.0 m³
Treatment volume2,200.0 m³
Surface area0.540 ha
Outletorifice
Outlet invert127.00 m
100-yr HGL129.00 m

Upper pond. Active storage ~2,200 m3. Outlet structure: orifice 0.2 m x 0.2 m. Permanent pool 1,300 m3. Live storage 2,500 m3 (from design sheet, noting some discrepancy with text stating ~2,200 m3 active). Weir at elevation 129.00 m, 0.1 m height x 0.5 m length.

Dry detentionPond 2 (Pond 1200 / SWM Pond #2)
Storage volume1,275.0 m³
Treatment volume900.0 m³
Surface area0.360 ha
Outletcompound weir
Outlet invert119.00 m
100-yr HGL120.00 m

Lower pond. Active storage ~900 m3. Staged outlet: low flow orifice 0.1 m x 0.2 m at invert 119.00 m; high flow orifice 0.2 m x 0.5 m at invert 119.50 m. Permanent pool 400 m3. Live storage 1,100 m3. Weir at elevation 120.00 m.

InfiltrationInfiltration Galleries
Outletpipe

Capture of first 5 mm of runoff from rooftop areas; overflow into storm sewer. Recommended for detailed design. Annual capture ~16,744 m3 across 46 storm events.

SwaleDrainage Swale

Drainage swale redirected around development along Sherwood Heights Drive.

Best management practices (4)
Dry detention pondsInfiltration galleriesDrainage swalePermanent pool for water quality
Site characteristics & report metadata
Project50 Sherwood Heights Drive – Functional Stormwater Management Report
Project typeNew
DeveloperInfrastructure Ontario
Existing land usevacant
Proposed land useindustrial/commercial
Site area7.40 ha
Impervious5% (pre) → 54% (post)
Water balance capture5.0 mm
TSS removal target80%
Quality control methodEnhanced water quality treatment via two-pond system with permanent pool; 80% long-term suspended solids removal per MECP requirements
Extraction audit
Confidence: high Completeness: 100% Source: 48-page PDF Extractor: PARCELFLOW v1 Validation: passed

How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.