Credit scorecard — Mississauga bylaw
Each category awards a maximum percentage of the annual stormwater charge as credit.
Evidence is extracted directly from the source PDF — no manual review.
✓Peak Flow
only some design storms documented
40%
✓Water Quality
TSS removal 80% (enhanced)
30%
✓Runoff Volume
water balance retains 5 mm on site (2% per mm, max 30% at 15 mm)
30%
—Operations
combinable O&A sub-credits — not documented
0%
Net credit
Capped at 50% of annual stormwater charge
50%
Pre vs post peak discharge
| Storm event | Pre-dev (L/s) | Post-dev (L/s) | Δ |
| 10-yr | 21.96 | 18.83 | −14% |
| 100-yr | — | 18.83 | — |
Stormwater controls (3)
Underground storageStormwater Management Tank
Storage volume20.5 m³
Treatment volume20.5 m³
Outletorifice
Outlet invert75.33 m
100-yr HGL76.33 m
75 mm diameter orifice tube; bottom elevation 75.20 m; minimum freeboard 0.10 m; tank area 20.5 m2; required active detention storage 20.0 m3, provided 20.5 m3; required retention storage 3.3 m3, provided 3.5 m3
Oil-grit separatorOil and Grit Separator
Located upstream of stormwater management tank; designed to provide >= 80% TSS removal; specifications to be provided at detailed design stage
InfiltrationInfiltration Gallery
Storage volume3.3 m³
Outletother
Located below outlet invert of stormwater management tank; designed minimum 1.0 m above highest recorded seasonal groundwater level; detailed design to be completed at later stage; retains remaining 3.3 m3 after 1.8 m3 initial abstraction
Best management practices (6)
Stormwater Management TankOil and Grit SeparatorInfiltration GalleryInitial AbstractionGround Level LandscapingRooftop Landscaping
Site characteristics & report metadata
Project50 High Street East Residential Development
Project typeRedevelopment
DeveloperMahogany Management
Existing land useresidential
Proposed land usemulti-unit residential
Site area0.10 ha
Water balance capture5.0 mm
TSS removal target80%
Allowable release rate22.0 L/s
Quality control methodoil and grit separator upstream of stormwater management tank
Extraction audit
Confidence: high
Completeness: 83%
Source: 47-page PDF
Extractor: PARCELFLOW v1
Validation: passed
Source PDF: Functional-Servicing-and-SWM-Report-OZ-25-19-w1-september-2025.pdf (47 pages)
Open source PDF →
Starter package
Download credit application package »
10-page PDF: pre-filled Form 2703, starter P.Eng report skeleton, submission checklist. Engineer reviews, adds site inspection + O&M plan, certifies + submits.
Download PDF »
How to read this page. Every value above was extracted from the source PDF by the
PARCELFLOW report parser, which combines a layout-robust template detector with a
validated extraction stage tuned to Ontario Functional Servicing and Stormwater
Management reports. The four-category scorecard maps the parsed evidence onto
Mississauga's credit bylaw. Numbers are estimates — engineering review still required
before submitting a formal credit application to the City.