Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.
| Storm event | Pre-dev (m3/s) | Post-dev (m3/s) | Δ |
|---|---|---|---|
| 2-yr 24-hr | 0.261 | 0.066 | −75% |
| 5-yr 24-hr | 0.449 | 0.178 | −60% |
| 10-yr 24-hr | 0.582 | 0.271 | −53% |
| 25-yr 24-hr | 0.773 | 0.412 | −47% |
| 50-yr 24-hr | 0.917 | 0.516 | −44% |
| 100-yr 24-hr | 1.064 | 0.615 | −42% |
Two-outlet system: Outlet No. 1 is 110mm diameter circular orifice at invert 242.50m for extended detention (erosion control); Outlet No. 2 is 675mm diameter orifice pipe at invert 242.95m for quantity control. Permanent pool volume = 1898 m3 (provided 1800 m3 per quality table). Extended detention volume provided = 932 m3. Clay liner (500mm thick) recommended. Bottom of pond at 240.80m. 29-hour drawdown time for extended detention.
HydroStorm HS-5 unit serving catchments 200 & 201 (0.996 ha, 78% imp). Provides 72% TSS removal. Used as forebay replacement.
HydroStorm HS-10 unit serving catchments 100 + 301 + 400A,B,C + 401A,B,C,D + 501 (4.211 ha, 71.5% imp). Provides 75% TSS removal. Used as forebay replacement.
How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.