Parsed SWM report

49 South Service Road

49 South Service Road Functional Servicing Report · Redevelopment · 2022-10-13

Consultant: WSP Canada Inc. Engineer: Mark Mitchell, P.Eng. P.Eng sealed Model: UNKNOWN
Credit scorecard — Mississauga bylaw

Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.

Peak Flow
discharge reduction — not documented
0%
Water Quality
TSS removal — not documented
0%
Runoff Volume
water-balance capture (2%/mm) — not documented
0%
Operations
BMPs + P.Eng present; sub-credit detection pending — full 20% requires explicit O&A items
20%
Net credit
Capped at 50% of annual stormwater charge
10%
Pre vs post peak discharge

No quantified pre-vs-post hydraulic events extracted.

Stormwater controls (1)
Underground storageStormwater Storage Tank
Outletorifice

Tank sized to control 100-year post-development flows to 2-year pre-development levels. Flow controlled by a flow control device and released to the existing 525mm storm sewer on South Service Road. Emergency overflow to surface included.

Best management practices (3)
Stormwater storage tankFlow control deviceInfiltration galleries (LID consideration noted in hydrogeological assessment)
Site characteristics & report metadata
Project49 South Service Road Functional Servicing Report
Project typeRedevelopment
DeveloperEdenshaw SSR Developments Limited
Existing land useinstitutional
Proposed land usehigh-density residential
Site area0.44 ha
Impervious84% (pre) → 71% (post)
Extraction audit
Confidence: medium Completeness: 67% Source: 140-page PDF Extractor: PARCELFLOW v1 Validation: review recommended
Source PDF: Functional-Servicing-Report.pdf (140 pages) Open source PDF →
Starter package
Download credit application package »
10-page PDF: pre-filled Form 2703, starter P.Eng report skeleton, submission checklist. Engineer reviews, adds site inspection + O&M plan, certifies + submits.
Download PDF »

How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.