Credit scorecard — Mississauga bylaw
Each category awards a maximum percentage of the annual stormwater charge as credit.
Evidence is extracted directly from the source PDF — no manual review.
—Peak Flow
discharge reduction — not documented
0%
—Water Quality
TSS removal — not documented
0%
—Runoff Volume
water-balance capture (2%/mm) — not documented
0%
✓Operations
BMPs + P.Eng present; sub-credit detection pending — full 20% requires explicit O&A items
20%
Net credit
Capped at 50% of annual stormwater charge
10%
Pre vs post peak discharge
No quantified pre-vs-post hydraulic events extracted.
Stormwater controls (0)
No stormwater controls extracted.
Best management practices (2)
side yard swalessplash pad for roof downspout discharge
Site characteristics & report metadata
ProjectFunctional Servicing Report - 44-45 Longview Place
Project typeNew
DeveloperDigamber Singh
Existing land usevacant
Proposed land usesingle-family residential
Site area0.50 ha
Extraction audit
Confidence: low
Completeness: 38%
Source: 18-page PDF
Extractor: PARCELFLOW v1
Validation: review recommended
Source PDF: Functional-Servicing-Report-OZ-OPA-21-12-W11-Oct-2021.pdf (18 pages)
Open source PDF →
Starter package
Download credit application package »
10-page PDF: pre-filled Form 2703, starter P.Eng report skeleton, submission checklist. Engineer reviews, adds site inspection + O&M plan, certifies + submits.
Download PDF »
How to read this page. Every value above was extracted from the source PDF by the
PARCELFLOW report parser, which combines a layout-robust template detector with a
validated extraction stage tuned to Ontario Functional Servicing and Stormwater
Management reports. The four-category scorecard maps the parsed evidence onto
Mississauga's credit bylaw. Numbers are estimates — engineering review still required
before submitting a formal credit application to the City.