4099 Erin Mills Parkway Functional Servicing and Stormwater Management Report · Redevelopment · 2024-10-28

Consultant: Arcadis Professional Services (Canada) Inc. Engineer: Shazia Nishat, Ph.D., P.Eng. P.Eng sealed Model: VisualOTTHYMO Revision: Second Submission (Rev 2)
Credit scorecard — Mississauga bylaw

Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.

Peak Flow
pre-vs-post controlled across multiple storms; avg reduction 19%
40%
Water Quality
TSS removal 80% (enhanced)
30%
Runoff Volume
water balance retains 5 mm on site (2% per mm, max 30% at 15 mm)
30%
Operations
BMPs + P.Eng present; sub-credit detection pending — full 20% requires explicit O&A items
20%
Net credit
Capped at 50% of annual stormwater charge
50%
Pre vs post peak discharge
Storm eventPre-dev (L/s)Post-dev (L/s)Δ
2-yr219.5192.6−12%
5-yr295.1236.7−20%
10-yr363.5273−25%
25-yr417.5319.4−23%
50-yr466364−22%
100-yr515.7399.7−22%
Regional Storm (Hurricane Hazel)375340−9%
Stormwater controls (4)
Underground storageSWM Management Tank (P1 level)
Storage volume793.3 m³
Treatment volume98.6 m³
Surface area0.028 ha
Outletorifice
Outlet invert151.11 m

281.8 m2 footprint; 300 mm orifice tube; max HGL depth 2.15 m for 100-yr; 0.6 m deep sump with 0.35 m retention zone for water balance reuse

Oil-grit separatorStormFilter SF0824 (also referenced as SF0825 on drawing)
Outletpipe
Outlet invert150.20 m

Contech Engineered Solutions StormFilter unit; inlet invert 151.11 m; outlet invert 150.20 m; provides 80% TSS removal; downstream of SWM tank

Rainwater harvesting / reuseWater Balance Reuse via Irrigation/Mechanical
Storage volume88.2 m³
Outletother

5 mm retention requirement; 132 m3 total retention required; 43.8 m3 via initial abstraction; 88.2 m3 reused via irrigation/mechanical within 72 hrs; 98.6 m3 total retention provided

SwaleCut-off Swale (south/east property limit)
Outletother

Existing swale conveying external drainage from townhouses to south; to be maintained in post-development condition along southern property limit

Best management practices (7)
Underground detention storage tankStormFilter cartridge filter unit (SF0824/SF0825)Rainwater reuse via irrigation and mechanical systemsGreen roof (proposed area = 0, but referenced in water balance table)Landscape/permeable surfaces for initial abstractionOil-grit separator (referenced in drawing legend)Swale (existing, maintained post-development)
Site characteristics & report metadata
Project4099 Erin Mills Parkway Functional Servicing and Stormwater Management Report
Project typeRedevelopment
DeveloperQueenscorp (Erin Mills) Group
Existing land usecommercial/retail plaza with asphalt parking lot
Proposed land usemixed residential (mid-rise and high-rise apartments, stacked townhouses) with ground-floor retail
Site area2.64 ha
Water balance capture5.0 mm
TSS removal target80%
Allowable release rate515.7 L/s
Quality control methodStormFilter cartridge filter unit (SF0824) providing 80% TSS removal; roof and landscaped areas considered inherently clean
Extraction audit
Confidence: high Completeness: 83% Source: 81-page PDF Extractor: PARCELFLOW v1 Validation: passed
Source PDF: functional-servicing-stormwater-management-report-november-2024-oz-opa-22-25-w8.pdf (81 pages) Open source PDF →
Starter package
Download credit application package »
10-page PDF: pre-filled Form 2703, starter P.Eng report skeleton, submission checklist. Engineer reviews, adds site inspection + O&M plan, certifies + submits.
Download PDF »

How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.