Parsed SWM report

393 Rymal Road West

Saint Elizabeth Village · New · 2024-03-20

Consultant: LandSmith Engineering & Consulting Ltd. Engineer: Andrew Smith Model: UNKNOWN
Credit scorecard — Hamilton bylaw

Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.

On-site controls
documented source control on the site
50%
Lake Ontario green-space bonus
direct discharge + green-space parcel flag (90% tier) — not documented
0%
Net credit
50% baseline; up to 90% with Lake Ontario direct-discharge + green-space flag
50%
Pre vs post peak discharge
Storm eventPre-dev (unknown)Post-dev (unknown)Δ
2-yr
5-yr
10-yr
25-yr
50-yr
100-yr
Stormwater controls (3)
Underground storageCULTEC Recharger 902HD system

CULTEC Isolator rows provide up to 70% long-term TSS removal; system also provides groundwater infiltration as LID measure

InfiltrationCULTEC Recharger 902HD infiltration

Directs stormwater runoff to groundwater infiltration; City initially flagged untreated infiltration concern (10% TSS removal), revised design claims up to 70% TSS removal via isolator rows

Oil-grit separatorOGS

Model number and location identified on revised Site Servicing Plan; flows from Areas 1 and 2 routed through OGS

Best management practices (4)
CULTEC Recharger 902HD underground storage/infiltration systemCULTEC Isolator rowsOil-Grit Separator (OGS)LID infiltration measures
Site characteristics & report metadata
ProjectSaint Elizabeth Village
Project typeNew
PermitZAC-20-029
Proposed land usemixed residential (multi-storey and townhouse)
TSS removal target70%
Quality control methodCULTEC Isolator rows (up to 70% TSS removal) and oil-grit separator
Extraction audit
Confidence: medium Completeness: 62% Source: 11-page PDF Extractor: PARCELFLOW v1 Validation: review recommended

How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.