Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.

Peak Flow
pre-vs-post controlled across multiple storms; avg reduction 2%
40%
Water Quality
TSS removal 80% (enhanced)
30%
Runoff Volume
water balance retains 5 mm on site (2% per mm, max 30% at 15 mm)
30%
Operations
combinable O&A sub-credits — not documented
0%
Net credit
Capped at 50% of annual stormwater charge
50%
Pre vs post peak discharge
Storm eventPre-dev (L/s)Post-dev (L/s)Δ
2-yr137.8137.8+0%
5-yr185.3185.3+0%
10-yr228.2215.2−6%
25-yr221
50-yr224.7
100-yr228.2
Stormwater controls (4)
Underground storageUnderground Stormwater Detention Tank
Storage volume278.5 m³
Outletorifice
Outlet invert165.07 m
100-yr HGL166.37 m

250mm diameter orifice tube located downstream of tank; located within underground parking garage; 2-year water level at 165.68m; 100-year water level at 166.37m; ground elevation 167.38m

Rainwater harvesting / reuseWater Re-use Tank
Storage volume49.2 m³
Treatment volume33.9 m³

Located in underground parking garage; provides erosion/volume control for first 5mm of runoff from impervious surfaces; used for irrigation/rainwater re-use; required volume 33.9 m3, provided 49.2 m3

Oil-grit separatorHydroFilter HF13 (MTD)

ETV certified Manufactured Treatment Device (MTD); HydroFilter HF13; sized for MECP Enhanced (Level 1) Protection; 80% TSS removal target; drainage area 1.59 ha; imperviousness 58%; treats 90% of annual runoff; achieves 84% annual TSS removal per Hydroworks sizing program; Toronto Central rainfall records used

SwaleGrassed Swales

Conveyance control; promotes infiltration, filtration, and evapotranspiration; contributes to water quality and quantity control and groundwater recharge

Best management practices (6)
Increased Topsoil DepthPassive LandscapingGrassed SwalesUnderground Stormwater Detention SystemManufactured Treatment Device (HydroFilter HF13)Water Re-use Tank
Site characteristics & report metadata
Project2555 Erin Centre Boulevard Mixed Use Condominium Development
Project typeRedevelopment
DeveloperStarmont Estates Inc.
Existing land usewood park, private urban plaza, residential homes
Proposed land usemixed-use condominium with retail at grade and underground parking
Site area1.01 ha
Water balance capture5.0 mm
TSS removal target80%
Allowable release rate228.8 L/s
Quality control methodTreatment train: increased topsoil depth + passive landscaping (at-source) + grassed swales (conveyance) + HydroFilter HF13 Manufactured Treatment Device (end-of-pipe)
Extraction audit
Confidence: high Completeness: 92% Source: 137-page PDF Extractor: PARCELFLOW v1 Validation: passed
Source PDF: Functional-Servicing-and-Stormwater-Management-Report-OZ-OPA-25-6-W11-February-2025.pdf (137 pages) Open source PDF →
Starter package
Download credit application package »
10-page PDF: pre-filled Form 2703, starter P.Eng report skeleton, submission checklist. Engineer reviews, adds site inspection + O&M plan, certifies + submits.
Download PDF »

How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.