Parsed SWM report

2155 Leanne Boulevard

Residential Development at 2155 Leanne Boulevard, Mississauga · Redevelopment · 2026-04-23

Consultant: Arcadis Professional Services (Canada) Inc. Engineer: Shazia Nishat, Ph.D., P.Eng. P.Eng sealed Model: UNKNOWN Revision: Rev 1
Credit scorecard — Mississauga bylaw

Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.

Peak Flow
only some design storms documented
40%
Water Quality
TSS removal 87% (enhanced)
30%
Runoff Volume
water balance retains 5 mm on site (2% per mm, max 30% at 15 mm)
30%
Operations
BMPs + P.Eng present; sub-credit detection pending — full 20% requires explicit O&A items
20%
Net credit
Capped at 50% of annual stormwater charge
50%
Pre vs post peak discharge
Storm eventPre-dev (L/s)Post-dev (L/s)Δ
10-yr300.7150−50%
10-yr4.74.7+0%
Stormwater controls (5)
Underground storageSWM Tank
Storage volume180.0 m³
Outletpipe

Underground SWM tank (120 m2 footprint) located on north-west boundary adjacent proposed underground parking structure at mid-rise building. Pump controlled release rate of 150.0 L/s. Required storage 156.3 m3, provided 180.0 m3.

OtherRooftop Storage
Storage volume394.6 m³
Outletother

Rooftop storage required 214.2 m3, provided 394.6 m3. Roof discharge rate 18.0 L/s.

Oil-grit separatorOGS 1 - Stormceptor EFO8
Outletpipe

Rinker/Imbrium Systems Stormceptor EFO8. Treats 47% of site. Water quality flow rate 27.80 L/s. Drainage area 1.072 ha, 89% imperviousness. 62% TSS removal. Outlets into proposed underground SWM tank.

Oil-grit separatorOGS 2 - Stormceptor EFO10
Outletpipe

Rinker/Imbrium Systems Stormceptor EFO10. Treats 53% of site plus flows from OGS 1. Water quality flow rate 38.80 L/s. Drainage area 2.285 ha, 41% imperviousness. 62% TSS removal.

Rainwater harvesting / reuseRainwater Reuse for Irrigation
Storage volume95.4 m³
Outletother

5 mm retention over total impervious area of 19,075 m2 (1.91 ha), equating to required water re-use volume of 95.4 m3. Rainwater reuse for irrigation is the primary means to meet the 5 mm retention requirement.

Best management practices (5)
Oil-Grit Separator (Stormceptor EFO8)Oil-Grit Separator (Stormceptor EFO10)Rooftop StorageUnderground SWM Tank with Pump ControlRainwater Reuse for Irrigation
Site characteristics & report metadata
ProjectResidential Development at 2155 Leanne Boulevard, Mississauga
Project typeRedevelopment
Developer1000293648 Ontario Inc. o/a Dunpar Developments
Existing land usecommercial retail plaza
Proposed land usemixed residential (townhouses and mid-rise)
Site area2.30 ha
Water balance capture5.0 mm
TSS removal target87%
Allowable release rate300.7 L/s
Quality control methodOil-grit separators (Stormceptor EFO8 and EFO10) combined with inherent treatment from rooftops and landscaping
Extraction audit
Confidence: high Completeness: 92% Source: 75-page PDF Extractor: PARCELFLOW v1 Validation: passed
Source PDF: Functional-Servicing-and-Stormwater-Report-OZ-OPA-26-7-W2-May-2026.pdf (75 pages) Open source PDF →
Starter package
Download credit application package »
10-page PDF: pre-filled Form 2703, starter P.Eng report skeleton, submission checklist. Engineer reviews, adds site inspection + O&M plan, certifies + submits.
Download PDF »

How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.