Parsed SWM report

1775 Thorny Brae Place

Thorny Brae Townhouse Development · New · 2025-10-16

Consultant: MGM Consulting Inc. Engineer: Blair Nock, CET Model: UNKNOWN Revision: 2nd Revision (October 16, 2025)
Credit scorecard — Mississauga bylaw

Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.

Peak Flow
discharge reduction — not documented
0%
Water Quality
TSS removal 80% (enhanced)
30%
Runoff Volume
water balance retains 5 mm on site (2% per mm, max 30% at 15 mm)
30%
Operations
combinable O&A sub-credits — not documented
0%
Net credit
Capped at 50% of annual stormwater charge
40%
Pre vs post peak discharge
Storm eventPre-dev (m3/s)Post-dev (m3/s)Δ
10-yr0.347
Stormwater controls (5)
Oil-grit separatorHydroDome HD 8
Outletpipe

Installed at outlet of internal storm system. Drainage area 1.526 ha, imperviousness 69%. Provides 80% annual TSS removal based on Toronto Central rainfall. Headloss calculated using full pipe flow of 0.61 m3/s for 525mm pipe at 2% slope; headloss 494mm above crown of 525mm outlet pipe.

OtherCatch Basin Shields

CB shields installed in all catch basins and double catch basins. Combined with OGS to form treatment train providing 80% TSS removal. CB Shield TSS removal = 60%, OGS TSS removal = 50%.

InfiltrationGreenStorm Stormwater Crates
Storage volume54.1 m³

Three GreenStorm Stormwater Crates collecting roof runoff from Blocks 3,4,7,8,9 & 10. Tank area 84.5 m2, depth 660mm, porosity 97%. Infiltration rate 15 mm/hr assumed for native soils. Infiltration time 44 hours. Required volume 53.0 m3, available volume 54.1 m3.

InfiltrationRear Yard Infiltration Facilities

Rooftop rainwater leaders of rear-draining building areas directed to rear yard infiltration facilities as LID measure.

Other300mm Deep Topsoil Layer (LID)

300mm deep topsoil layer implemented to reduce surface runoff and promote infiltration as LID measure.

Best management practices (8)
HydroDome HD 8 Oil-Grit SeparatorCatch Basin ShieldsGreenStorm Stormwater Crates (underground infiltration)300mm Deep Topsoil LayerRear Yard Infiltration FacilitiesSilt FenceMud Mat at Construction EntranceCatchbasin Sediment Protection
Site characteristics & report metadata
ProjectThorny Brae Townhouse Development
Project typeNew
DeveloperKingride Developments
Existing land usevacant residential (four vacant one-story residential buildings)
Proposed land usemulti-unit residential townhouse
Site area1.53 ha
Water balance capture5.0 mm
TSS removal target80%
Quality control methodtreatment train: catch basin shields + HydroDome HD 8 oil-grit separator
Extraction audit
Confidence: high Completeness: 83% Source: 42-page PDF Extractor: PARCELFLOW v1 Validation: passed
Source PDF: Functional-Servicing-and-Stormwater-Management-Report-OZ-OPA-25-16-W8-October-2025.pdf (42 pages) Open source PDF →
Starter package
Download credit application package »
10-page PDF: pre-filled Form 2703, starter P.Eng report skeleton, submission checklist. Engineer reviews, adds site inspection + O&M plan, certifies + submits.
Download PDF »

How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.