Parsed SWM report

150 Rutledge Road

The VIC 2 - 150 Rutledge Road · New · 2024-04-01

Consultant: Urban Ecosystems Limited (UEL) Model: PCSWMM
Credit scorecard — Mississauga bylaw

Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.

Peak Flow
discharge reduction — not documented
0%
Water Quality
TSS removal 85% (enhanced)
30%
Runoff Volume
water-balance capture (2%/mm) — not documented
0%
Operations
combinable O&A sub-credits — not documented
0%
Net credit
Capped at 50% of annual stormwater charge
30%
Pre vs post peak discharge

No quantified pre-vs-post hydraulic events extracted.

Stormwater controls (2)
Underground storageStorage Tanks
Outletorifice

Storage tank with orifice plate control at control MH; details shown on drawing SS-1

Oil-grit separatorJellyfish Filter JF4 Peak Diversion
Outletpipe

Jellyfish Filter membrane filtration unit by Imbrium Systems; max treatment 12.7 L/s; max bypass capacity 70.8 L/s; max combined peak capacity 83.5 L/s; inlet pipe 300mm max, outlet pipe 380mm max

Best management practices (3)
Jellyfish Filter JF4 Peak DiversionUnderground Storage TanksOrifice Plate Flow Control
Site characteristics & report metadata
ProjectThe VIC 2 - 150 Rutledge Road
Project typeNew
Proposed land useresidential condominium
TSS removal target85%
Quality control methodJellyfish membrane filtration filter (oil-grit separator with membrane filtration cartridges)
Extraction audit
Confidence: medium Completeness: 50% Source: 130-page PDF Extractor: PARCELFLOW v1 Validation: review recommended
Source PDF: Functional-Servicing-and-Stormwater-Management-Report-OZ-OPA-24-12-W11.pdf (130 pages) Open source PDF →
Starter package
Download credit application package »
10-page PDF: pre-filled Form 2703, starter P.Eng report skeleton, submission checklist. Engineer reviews, adds site inspection + O&M plan, certifies + submits.
Download PDF »

How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.