Parsed SWM report

1470 Williamsport Drive

1470 Williamsport Drive Residential Development · Redevelopment · 2025-09-30

Consultant: C.F. Crozier & Associates Inc. Engineer: Matt Coleridge, P.Eng; Emily McNamee, P.Eng P.Eng sealed Model: OTHER Revision: Sub. 3
Credit scorecard — Mississauga bylaw

Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.

Peak Flow
pre-vs-post controlled across multiple storms; avg reduction 69%
40%
Water Quality
TSS removal 80% (enhanced)
30%
Runoff Volume
water balance retains 5 mm on site (2% per mm, max 30% at 15 mm)
30%
Operations
BMPs + P.Eng present; sub-credit detection pending — full 20% requires explicit O&A items
20%
Net credit
Capped at 50% of annual stormwater charge
50%
Pre vs post peak discharge
Storm eventPre-dev (L/s)Post-dev (L/s)Δ
2-yr55.0918.81−66%
5-yr22.5
10-yr25.51
25-yr29.34
50-yr33.04
100-yr129.4236.07−72%
Stormwater controls (4)
Underground storageStormwater Management Tank (P1 Level)
Storage volume206.2 m³
Treatment volume18.5 m³
Outletorifice
Outlet invert135.25 m
100-yr HGL136.78 m

100 mm diameter Orifice Tube outlet control device; tank area 135.2 m2; located at P1 level northeast corner of underground; includes 74.4 m3 reuse sump below outlet invert; constant groundwater inflow of 0.63 L/s included in calculations

Oil-grit separator1200 mm Up-Flo Filter

Hydro International Up-Flo Filter with CPZ Media; installed downstream of storage tank; provides Enhanced Level water quality protection (80% TSS removal)

Green roofGreen Roof

Green roof included in pervious area calculations for post-development catchment 201

Rainwater harvesting / reuseWater Reuse Sump
Storage volume74.4 m³
Outletother

Located below outlet invert of stormwater management tank; used for on-site irrigation reuse; 72-hr irrigation demand is 21.12 m3; pump to be designed by Mechanical/Irrigation Consultant

Best management practices (8)
Underground Stormwater Management TankOrifice Tube Outlet Control DeviceUp-Flo Filter with CPZ MediaGreen RoofWater Reuse/Rainwater Harvesting (Irrigation)Silt FencingRock Mud MatSilt Sacks
Site characteristics & report metadata
Project1470 Williamsport Drive Residential Development
Project typeRedevelopment
Developer1470 Williamsport Holdings Inc. c/o Compten Management Inc.
Existing land useresidential (6-storey apartment building with surface parking and landscaped areas)
Proposed land useresidential (two 12-storey residential towers with 1-storey podium, 283 units)
Site area0.59 ha
Water balance capture5.0 mm
TSS removal target80%
Allowable release rate47.5 L/s
Quality control method1200 mm Hydro International Up-Flo Filter with CPZ Media installed downstream of underground storage tank
Extraction audit
Confidence: high Completeness: 92% Source: 103-page PDF Extractor: PARCELFLOW v1 Validation: passed
Source PDF: Functional-Servicing-and-Stormwater-Management-Report-OZ-OPA-25-7-W3-October-2025.pdf (103 pages) Open source PDF →
Starter package
Download credit application package »
10-page PDF: pre-filled Form 2703, starter P.Eng report skeleton, submission checklist. Engineer reviews, adds site inspection + O&M plan, certifies + submits.
Download PDF »

How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.