Parsed SWM report

1315 Bough Beeches Boulevard

Functional Servicing & Stormwater Management Report – Residential Development, 1315 Bough Beeches Boulevard · Redevelopment · 2026-03-24

Consultant: fabian papa & partners (fp&p), A Division of FP&P HydraTek Inc. Engineer: Paolo F. Albanese, P.Eng. P.Eng sealed Model: VisualOTTHYMO Revision: Revision 1
Credit scorecard — Mississauga bylaw

Each category awards a maximum percentage of the annual stormwater charge as credit. Evidence is extracted directly from the source PDF — no manual review.

Peak Flow
only some design storms documented
40%
Water Quality
TSS removal 80% (enhanced)
30%
Runoff Volume
water balance retains 27 mm on site (2% per mm, max 30% at 15 mm)
30%
Operations
BMPs + P.Eng present; sub-credit detection pending — full 20% requires explicit O&A items
20%
Net credit
Capped at 50% of annual stormwater charge
50%
Pre vs post peak discharge
Storm eventPre-dev (L/s)Post-dev (L/s)Δ
10-yr51.634.3−34%
Stormwater controls (3)
Rainwater harvesting / reuseUnderground Rainwater Harvesting Storage Tank
Storage volume104.0 m³
Outletoverflow

Located within P1 underground level. Tank dimensions: 2.5 m depth x 41.6 m2 area. Emergency overflow lid (OPSD 400.100 open grate) at elevation 149.05 m. Required retention volume is 46.8 m3; provided volume of 104.0 m3 satisfies water balance requirement. Annual inspection recommended.

Oil-grit separatorContech Stormfilter SFPD0608
Outletpipe

1 cartridge, 18-inch height, Phosphosorb media. Installed off-line upstream of storm service connection to treat hard surface (asphalt driveway) runoff. Treatment drainage area 0.0069 ha, Rc=0.90, treatment flow 0.22 L/s, peak flow 11.1 L/s. 80% TSS removal, 90% annual runoff captured. Maintenance every 6 months with quarterly inspections initially.

Green roofGreen Roof
Surface area0.071 ha

Green roof area 712 m2 (21.8% of total site). TSS removal rate 80%. Initial abstraction 5 mm (3.6 m3). Runoff coefficient 0.50.

Best management practices (5)
Green RoofPermeable PaversLandscapingContech Stormfilter SFPD0608 (off-line cartridge filter)Underground Rainwater Harvesting Storage Tank
Site characteristics & report metadata
ProjectFunctional Servicing & Stormwater Management Report – Residential Development, 1315 Bough Beeches Boulevard
Project typeRedevelopment
Developer1315 Bough Beeches Boulevard Limited
Existing land useresidential (surface parking, sports courts, pedestrian walkways, landscaped islands associated with existing 20-storey residential building)
Proposed land useresidential (13-storey residential building)
Site area0.33 ha
Impervious50% (pre) → 43% (post)
Water balance capture27.0 mm
TSS removal target80%
Quality control methodGreen roof, permeable pavers, landscaping (80% TSS removal each) plus Contech Stormfilter off-line cartridge filter for hard surface runoff; combined to achieve minimum 80% TSS removal
Extraction audit
Confidence: high Completeness: 100% Source: 92-page PDF Extractor: PARCELFLOW v1 Validation: passed
Source PDF: Functional-Servicing-and-Stormwater-Management-Report-OZ-OPA-26-5-W3-April-2026.pdf (92 pages) Open source PDF →
Starter package
Download credit application package »
10-page PDF: pre-filled Form 2703, starter P.Eng report skeleton, submission checklist. Engineer reviews, adds site inspection + O&M plan, certifies + submits.
Download PDF »

How to read this page. Every value above was extracted from the source PDF by the PARCELFLOW report parser, which combines a layout-robust template detector with a validated extraction stage tuned to Ontario Functional Servicing and Stormwater Management reports. The four-category scorecard maps the parsed evidence onto Mississauga's credit bylaw. Numbers are estimates — engineering review still required before submitting a formal credit application to the City.