Credit scorecard — Oakville 2026 bylaw
Each category awards a maximum percentage of the annual stormwater charge as credit.
Evidence is extracted directly from the source PDF — no manual review.
✓Enhanced SWM (≥80% TSS)
Provincial Enhanced — exceeds Oakville minimums
50%
—Normal SWM (≥70% TSS)
Provincial Normal — meets baseline — not documented
0%
—Basic SWM (≥60% TSS)
Provincial Basic — meets minimum — not documented
0%
Net credit
Up to 50% for non-residential with SWM exceeding minimum design standards
50%
Pre vs post peak discharge
| Storm event | Pre-dev (L/s) | Post-dev (L/s) | Δ |
| 5-yr | 41.3 | 18.2 | −56% |
| 25-yr | 58.7 | 35.2 | −40% |
| 100-yr | 72.6 | 35.4 | −51% |
Stormwater controls (6)
Underground storageGreenstorm Geocellular/Bottomless SWM Chamber
Storage volume80.0 m³
Treatment volume90.0 m³
Outletorifice
Outlet invert125.91 m
100-yr HGL128.24 m
95 mm diameter orifice; actual release rate 37.9 L/s (preliminary design uses 35.4 L/s); bottomless/perforated to allow infiltration; positioned above highest observed groundwater; max drawdown 72 hours; product by Stormcon
InfiltrationGreenstorm Bottomless Chamber Infiltration
Storage volume90.0 m³
Outletoverflow
Infiltration of 25 mm storm event per Town of Oakville 2024 water balance standard; 87.4 m3 required, 90 m3 provided; treated prior to infiltration via OGS upstream
Oil-grit separatorOil Grit Separator (OGS)
Positioned upstream of underground SWM chamber; ETV certified; sized for required particle size distribution by manufacturer; achieves 80% TSS removal
SwaleLID Swales with Enhanced Planting
Low Impact Development swales with enhanced planting as part of grading design
OtherAbove Ground Storage at Low Points
Above ground storage at various low points within paved areas
OtherOversized Storm Sewer Storage
Storage volume6.0 m³
Outletpipe
Storage within site storm sewer system using oversized sewers
Best management practices (9)
Oil Grit Separator (OGS)Underground geocellular/bottomless SWM chamber (Greenstorm by Stormcon)LID swales with enhanced plantingRoof leaders directed to softscape/landscaping for natural infiltrationOversized storm sewers for storageAbove ground storage at low pointsCatchbasin silt sacks (construction ESC)Silt fencing (construction ESC)Mud mat (construction ESC)
Site characteristics & report metadata
Project1295 Sixth Line, Oakville
Project typeRedevelopment
DeveloperCreditmills Development Group
Existing land useresidential (single unit with driveway)
Proposed land useresidential townhouse (30 units, 3 blocks)
Site area0.38 ha
Impervious13% (pre) → 80% (post)
Water balance capture25.0 mm
TSS removal target80%
Allowable release rate41.3 L/s
Quality control methodoil-grit separator upstream of underground geocellular/bottomless infiltration chamber; roof leaders directed to softscape/landscaping for natural infiltration; LID swales with enhanced planting
Extraction audit
Confidence: high
Completeness: 100%
Source: 36-page PDF
Extractor: PARCELFLOW v1
Validation: passed
How to read this page. Every value above was extracted from the source PDF by the
PARCELFLOW report parser, which combines a layout-robust template detector with a
validated extraction stage tuned to Ontario Functional Servicing and Stormwater
Management reports. The four-category scorecard maps the parsed evidence onto
Mississauga's credit bylaw. Numbers are estimates — engineering review still required
before submitting a formal credit application to the City.