Credit scorecard — Mississauga bylaw
Each category awards a maximum percentage of the annual stormwater charge as credit.
Evidence is extracted directly from the source PDF — no manual review.
—Peak Flow
discharge reduction — not documented
0%
✓Water Quality
TSS removal 92% (enhanced)
30%
✓Runoff Volume
water balance retains 5 mm on site (2% per mm, max 30% at 15 mm)
30%
—Operations
combinable O&A sub-credits — not documented
0%
Net credit
Capped at 50% of annual stormwater charge
40%
Pre vs post peak discharge
| Storm event | Pre-dev (m3/s) | Post-dev (m3/s) | Δ |
| 2-yr | 0.07 | 0.114 | +63% |
| 5-yr | 0.07 | 0.153 | +119% |
| 10-yr | 0.07 | 0.189 | +170% |
| 25-yr | 0.07 | 0.238 | +240% |
| 50-yr | 0.07 | 0.29 | +314% |
| 100-yr | 0.07 | 0.33 | +371% |
Stormwater controls (6)
Underground storageSWM Detention Tank (P2)
Storage volume300.0 m³
Outletorifice
Outlet invert119.15 m
100-yr HGL114.58 m
Located at P2 parking level (FF 114.95+/-). Tank dimensions: 3m H x 10m W x 10m L. Bottom of tank at 111.95+/-. Water returned via pump to P1 diversion/retention tank. 100-year water level = 114.58+/-.
Underground storageSWM Retention/Diversion Tank (P1)
Storage volume30.0 m³
Treatment volume30.0 m³
Outletorifice
Outlet invert119.15 m
Located at P1 parking level (FF 118.05+/-). Required volume = 29.2 m3 (report text) / 29.9 m3 (drawing). Provided volume = 30 m3. Dimensions: 1.1m H x 4.7m W x 5.8m L. Diversion weir invert 119.64. Used for greywater reuse.
Oil-grit separatorStormceptor EF06
Outletpipe
Outlet invert119.68 m
Imbrium Stormceptor EF06 (or approved equivalent). Provides 82% TSS removal and treats >90% of annual flows. RIM elevation 120.70, E INV IN 119.70, S INV OUT 119.68. Estimated water quality flow rate 23.23 L/s.
Green roofGreen Roof
Green roof area: 535 m2. Assists with rainfall retention via initial abstraction and evapotranspiration. Provides 100% TSS removal for that catchment area.
Rainwater harvesting / reuseGreywater Reuse System
Storage volume30.0 m³
Outletother
Grey water reuse for landscape irrigation and potentially toilets. Irrigation demand estimated at 4.1 m3/day in peak month of July. Supplementary building greywater systems to be explored with mechanical consultant.
SwaleTemporary Swales with Check Dams (ESC)
Temporary erosion and sediment control measure during construction only.
Best management practices (10)
Stormceptor EF06 oil/grit separatorGreen roof (535 m2)Underground detention tank (P2)Underground retention/diversion tank (P1)Greywater reuse systemFlow attenuation device (orifice tube)Silt fence/wattleCatchbasin sediment protectionStabilized construction entranceTemporary swales with check dams
Site characteristics & report metadata
Project1000 & 1024 Dundas Street East Development
Project typeRedevelopment
DeveloperAhmed Developments Inc.
Existing land usecommercial/urban (hard surfaces)
Proposed land usemixed-use residential/commercial (16-storey and 20-storey towers with podiums)
Site area0.84 ha
Impervious86% (pre) → 81% (post)
Water balance capture5.0 mm
TSS removal target92%
Allowable release rate70.0 L/s
Quality control methodoil-grit separator (Stormceptor EF06) as primary treatment, supplemented by green roof and soft landscape areas
Extraction audit
Confidence: high
Completeness: 100%
Source: 81-page PDF
Extractor: PARCELFLOW v1
Validation: passed
Source PDF: W1_1000_1024_Functional_Servicing_and_Stormwater_Report_Sept2022.pdf (81 pages)
Open source PDF →
Starter package
Download credit application package »
10-page PDF: pre-filled Form 2703, starter P.Eng report skeleton, submission checklist. Engineer reviews, adds site inspection + O&M plan, certifies + submits.
Download PDF »
How to read this page. Every value above was extracted from the source PDF by the
PARCELFLOW report parser, which combines a layout-robust template detector with a
validated extraction stage tuned to Ontario Functional Servicing and Stormwater
Management reports. The four-category scorecard maps the parsed evidence onto
Mississauga's credit bylaw. Numbers are estimates — engineering review still required
before submitting a formal credit application to the City.